GOLD: Eastmain Resources Reports Initial Drilling and Channel Sampling Results for Eleonore South

TORONTO: Eastmain Resources Inc. is pleased to announce the reports of the Moni gold prospect channel sampling results and the first five diamond drill […]
TORONTO: Eastmain Resources Inc. is pleased to announce the reports of the Moni gold prospect channel sampling results and the first five diamond drill holes of the 12-hole Phase 1 Program. Assays are pending on the remaining seven holes. The results of the entire Phase 1 program will be used to determine the Phase 2 program expected to begin in early 2017 at the Éléonore South Joint Venture Property, in James Bay, Quebec. Gold mineralization appears to be associated with a late, magmatic intrusion-related hydrothermal system with considerable exploration potential. The prospective corridor extends over an area at least 3 to 4 km long by some 500 m wide, along the margins of a tonalite intrusion, close to or near the contact with surrounding metasediments. The association between mineralized tonalitic and pegmatitic facies over significant widths along the margins of a tonalite intrusion suggests a large-scale hydrothermal-magmatic mineralized system on the Éléonore South Property. Additional work will aim to determine the richest parts of the system. For full results, visit www.eastmain.com.

Comments

Your email address will not be published. Required fields are marked *