Red Lake mine's two existing shafts are being replaced by a single main shaft and adjacent ventilation shaft. The 6.55-m-diameter cement-lined circular shaft will extend from surface to 2,180-m depth. Contractors from Cementation Canada are seen preparing the bucket for hoisting.
Comments