COBALT: Jervois plans for production at Idaho Cobalt in 2021

IDAHO – With the eCobalt Solutions merger complete, Jervois Mining of Melbourne, Australia, is making plans for commercial production at the Idaho […]
Site of the Idaho Cobalt operation near Salmon, Idaho. (Image: JDS Mining)
[caption id="attachment_1003729811" align="aligncenter" width="417"] Site of the Idaho Cobalt operation near Salmon, Idaho. (Image: JDS Mining)[/caption] IDAHO – With the eCobalt Solutions merger complete, Jervois Mining of Melbourne, Australia, is making plans for commercial production at the Idaho cobalt operation (ICO) in the second half of 2021. A 12-month construction period is anticipated. Jervois is assembling a team to produce a feasibility study for the ICO. A summer drill program will provide information to support final tests, to enhance geological confidence of the resource, and for a 1,090-t/d concentrator. Jervois expects the concentrator to be equipped with SAG milling. At the same time, Jervois intends to undertake a scoping study of producing refined cobalt and copper from ICO concentrate. Such a refinery in the state would improve project economics, increase investment, and provide skilled jobs. Both studies are to be complete in Q1 2010. Please see the corporate presentation at www.JervoisMining.com.au.  

Comments

Your email address will not be published. Required fields are marked *

Dec 01 2024 - Dec 02 2024
Dec 03 2024 - Dec 05 2024