GOLD: Bonterra’s latest bonanza at Gladiator

QUEBEC – Val d’Or, Que.-based Bonterra Resources continues to intersect bonanza grades – 101.1 g/t over 3.9 metres – at its Gladiator […]
Core from the Gladiator project, one of three Bonterra fast-tracked gold developments. (Image: Bonterra Resources)

Topics

Commodities

Regions

Tags

Companies

[caption id="attachment_1003729167" align="aligncenter" width="401"] Core from the Gladiator project, one of three Bonterra fast-tracked gold developments. (Image: Bonterra Resources)[/caption] QUEBEC – Val d’Or, Que.-based Bonterra Resources continues to intersect bonanza grades – 101.1 g/t over 3.9 metres – at its Gladiator project as it continues step out drilling about 170 km northeast of Val d’Or. Gold mineralization is now known to extend at both the Barbeau and North zones. The 101.0 g/t result came from the Barbeau zone about 50 metres down plunge of the known mineralization. A second  hole in the North zone returned 8.1 g/t over 1.8 metre. Bonterra is also drilling from surface and underground at the Moroy property 1 km from the operating Bachelor gold mine 90 km northeast of Lebel-sur-Quevillon. Core from Moray has assayed 12.8 g/t gold over 5.6 metres, 12.1 g/t over 5.4 metres, and 3.6 g/t over 2.3 metres. The deposit is open both at depth and along strike. Drilling at the Barry project 100 km east of Lebel-sur-Quevillon and 115 km south of the Bachelor mine has extended known mineralization along strike and at depth in several zones. Assays included 8.7 g/t gold over 1.5 metres, 6.1 g/t over 2.0 metres, 6.3 g/t over 1.5 metre, and 5.9 g/t over 1.5 metre. Bonterra currently has five rigs working on the three sites. Find more information at www.BTResources.com.

Comments

Your email address will not be published. Required fields are marked *

Dec 01 2024 - Dec 02 2024
Dec 03 2024 - Dec 05 2024