LITHIUM: Case Lake bench scale tests underway says Power Metals

ONTARIO – Vancouver-based Power Metals and its 20% partner MGX Minerals have sent a 10-km sample of core for testing from the […]
Samples collected from the Main dyke at the Case Lake lithium property. (Image: Power Metals Corp.)

Topics

Commodities

Regions

Tags

[caption id="attachment_1003724200" align="aligncenter" width="532"] Samples collected from the Main dyke at the Case Lake lithium property. (Image: Power Metals Corp.)[/caption] ONTARIO – Vancouver-based Power Metals and its 20% partner MGX Minerals have sent a 10-km sample of core for testing from the Case Lake lithium project 130 km northeast of Timmins. Bench-scale metallurgical tests of the spodumene rich material are being done by Orion Labs and Light Metals International (LMI). The core samples are undergoing chemical and mineralogical homogeneity tests with the goal of producing a 95% spodumene concentrate. Once that level of purity is achieved, work will begin to develop a hydrothermal leaching process to make an even higher grade concentrate. MGX, Orion and LMI are developing a thermochemical technology to extract lithium carbonate and/or lithium hydroxide from a variety of spodumene concentrates. According to Power Metals the method is modular and highly scalable and has the potential to substantially cut production costs. Much of the savings will be achieved by the elimination of sulphuric acid leaching. The Case Lake property has at least five dykes that are exposed at surface and are open along strike. The dykes exhibit various minerals – the North and Main dykes have spodumene rich zones, the Northeast dyke has very course grained spodumene,  the South dyke has no spodumene, and the East dyke has course grained feldspar, quartz and minor other minerals. Find more information at www.PowerMetalsCorp.com.

Comments

Your email address will not be published. Required fields are marked *

Dec 01 2024 - Dec 02 2024
Dec 03 2024 - Dec 05 2024