BRITISH COLUMBIA –
Garibaldi Resources of Vancouver says its geologists believe the E&L mineralization will prove to be a large tonnage, high grade intrusion defined over a length of 4 km and a width of 1.5 km. This is the first magmatic nickel-copper-rich massive sulphide system in the prolific Eskay mining camp.
[caption id="attachment_1003717374" align="alignright" width="178"]
Part of the massive sulphide outcrop at the E&L intrusion in the Eskay mining camp.[/caption]
After compilation and interpretation of historic and current data, including 3-D modeling, Garibaldi says the E&L intrusion may host more than one such deposit. A heli-borne electromagnetic survey is to be carried out as soon as weather permits. A major 2017 drill program is also planned.
To view an updated E&L fact sheet, please visit
www.GaribaldiResources.com/i/front/GGI_E-L_Project_Fact_Sheet_2017.pdf.
Comments