QUEBEC –
Metanor Resources of Val d’Or, QC, has intersected 10.4 g/t Au over 8.8 metres during the latest drilling in the Main vein at its Bachelor gold mine 90 km northeast of Lebel-sur-Quevillon.
The intersection was made from the drill bay on level 14 as the ramp is below that point and approaching level 15 in the Main vein. Mine development is continuing toward the recently drilled sectors and ore production should begin in the next month.
The most recent technical report for the Bachelor project is available at
www.Metanor.ca.
Comments